Zenithtrevia
كل الفرص

المعادن الصلبة ✓ Verified

Pilbara Iron Ore Offtake

Run by Pilbara Resources

Offtake against confirmed buyer contract

15%

projected, annualised · quoted as متوقَّع 15% سنويًا

Term
سنة واحدة
You get paid
ربع سنويًا
Minimum
$500
Liquidity
Locked
Structure
Fixed
45% funded of $200,000
Invest in this

السعر أعلاه توقّع مبني على خطة المشغّل ومراجعتنا لها — وليس عائدًا ندين لك به.

Due diligence

ما فحصناه.

9 of 9 checks passed against 1 document on file · last reviewed منذ شهرين

  • Operator identity and registration confirmed Confirmed منذ شهرين
  • Supporting documents supplied and legible Confirmed منذ شهرين
  • Term, minimum and capacity are internally consistent Confirmed منذ شهرين
  • Projected return is supported by the submitted plan Confirmed منذ شهرين
  • Risk disclosures are complete and not understated Confirmed منذ شهرين
  • Independently verified against a second source Confirmed منذ شهرين
  • Mining licence current and in the operator's name Confirmed منذ شهرين
  • Resource estimate reviewed Confirmed منذ شهرين
  • Environmental permit in force Confirmed منذ شهرين

كن صادقًا مع نفسك

ما الذي قد يسوء.

ننشرها نحن، ولا ندفنها نحن. هذه هي الطرق المحددة التي يخسر بها هذا المشروع بالذات المال.

Buyer default

Haulage disruption

Grade rejection at port

كل المخاطر، كاملةً

قد تكون أموالك تعمل الليلة.

افتح حسابًا في دقيقتين. موّله، اختر شيئًا، وتابع كل دولار فيه.