Due diligence
ما فحصناه.
8 of 10 checks passed against 1 document on file · last reviewed منذ 3 أشهر
- ✓ Operator identity and registration confirmed Confirmed منذ 3 أشهر
- ✓ Supporting documents supplied and legible Confirmed منذ 3 أشهر
- ✓ Term, minimum and capacity are internally consistent Confirmed منذ 3 أشهر
- ✓ Projected return is supported by the submitted plan Confirmed منذ 3 أشهر
- ✓ Risk disclosures are complete and not understated Confirmed منذ 3 أشهر
- ○ Independently verified against a second source Not yet confirmed
- ✓ Generation licence current Confirmed منذ 3 أشهر
- ✓ Power purchase agreement signed with a named offtaker Confirmed منذ 3 أشهر
- ✓ Grid connection or distribution agreement in place Confirmed منذ 3 أشهر
- ○ Independent yield study reviewed Not yet confirmed
كن صادقًا مع نفسك
ما الذي قد يسوء.
ننشرها نحن، ولا ندفنها نحن. هذه هي الطرق المحددة التي يخسر بها هذا المشروع بالذات المال.
The offtaker may not pay
Generation below the yield study
Tariffs can be changed by regulators